A German manufacturer of industrial fans needed to streamline their complex custom-order process, which relied on limited, pre-designed combinations and required months of R&D for new configurations. Partnering with FPT, they implemented a flexible, automated product configuration solution that reduced processing time to 3 minutes for 400,000 combinations and cut manual design work by 20–30%.
Free Download